ГЕНЕРАТОР УСТАНОВКА

PROCEDURE


  1. INSTALL GENERATOR ASSEMBLY


    1. Install the generator assembly with the 2 bolts.

      Torque:
      52 N*m  { 530 kgf*cm, 38 ft.*lbf }
    2. Connect the wire harness clamp bracket with the bolt.

      Torque:
      7.7 N*m  { 79 kgf*cm, 68 in.*lbf }
    3. Connect the generator assembly connector.

    4. Connect the wire harness to terminal B with the nut.

      Torque:
      9.8 N*m  { 100 kgf*cm, 87 in.*lbf }
    5. Install the terminal cap.

  2. INSTALL V-RIBBED BELT

    Click here

  3. INSTALL RADIATOR COVER SUB-ASSEMBLY (for ALPHARD)

    Click here

  4. INSTALL RADIATOR COVER SUB-ASSEMBLY (for VELLFIRE)

    Click here

  5. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected.

    Click here