SOLAR SENSOR INSTALLATION

PROCEDURE


  1. INSTALL AUTOMATIC LIGHT CONTROL SENSOR


    1. A004JR1

      Engage the 2 claws and install the automatic light control sensor.

    2. Connect the connector.

  2. INSTALL NO. 1 DEFROSTER NOZZLE GARNISH


    1. Engage the 3 claws and install the No. 1 defroster nozzle garnish.

  3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Torque:
    6.0 N*m  { 61 kgf*cm, 53 in.*lbf }