KNOCK SENSOR INSTALLATION
PROCEDURE
INSTALL KNOCK SENSOR
-
*A
for Bank 2
*B
for Bank 1
*a
Engine Rear
*b
Top
*c
Engine Front
*d
0 to 15°
Install the 2 sensors with the 2 bolts as shown in the illustration.
20 N*m
204 kgf*cm
15 ft.*lbf
Connect the 2 sensor connectors.
-
INSTALL NO. 1 WATER OUTLET PIPE
Install the water outlet pipe with the 2 nuts and bolt.
10 N*m
102 kgf*cm
7 ft.*lbf
Attach the 3 wire harness clamps.
INSTALL CYLINDER HEAD SUB-ASSEMBLY (for Bank 1)