CAUTION / NOTICE / HINT
Tech Tips
Use the same procedure for RHD and LHD vehicles.
The procedure listed below is for LHD vehicles.
PROCEDURE
INSTALL LIGHT CONTROL RHEOSTAT
Engage the 2 claws to install the light control rheostat.
INSTALL SWITCH BASE
Engage the 4 claws to install the switch base.
INSTALL NO. 1 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY (w/o Knee Airbag)
Connect each connector.
| *1 | Aspirator Hose |
for Automatic Air Conditioning System for RHD:
Connect the connector.
Engage the guide and connect the aspirator hose.
Engage the 4 claws.
Engage the 4 clips to install the No. 1 instrument panel under cover sub-assembly.
Install the 2 screws.
INSTALL NO. 1 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY (w/ Knee Airbag)
Connect each connector.
Engage the 2 claws.
Engage the 6 clips to install the No. 1 instrument panel under cover sub-assembly.
Install the screw.
INSTALL INSTRUMENT SIDE PANEL LH