ECD SYSTEM (w/ EGR Cooler) INITIALIZATION

Tech Tips

After replacing the supply pump and/or ECM:



  1. SUPPLY PUMP INITIALIZATION PROCEDURE


    1. A01DXTZE01

      Connect the intelligent tester to the DLC3.

    2. Turn the ignition switch ON.

      Note

      Do not start the engine.

    3. Turn the intelligent tester ON.

    4. Enter the following menus: Powertrain / Engine / Utility / Supply Pump Initialization.

    5. Press Next.

    6. A01DYMFE01

      Press Next.

    7. A01DZTSE01

      Press Exit.

    8. Start the engine to check if the initialization is complete. If the engine cannot be started, repeat the initialization procedures from the beginning.

    9. Idle the engine for at least 1 minute under the following conditions (Procedure "A"):


      • The water temperature is 60°C (140°F) or more.

      • The fuel temperature is 20°C (68°F) or more.

      Note


      • Do not the race engine immediately after starting the engine.

      • After idling the engine, racing the engine is acceptable.

        Tech Tips


        • The water temperature can be estimated by touching the outlet hose.

        • The fuel temperature can be estimated by using the ambient temperature as a substitute.

        • If the water and fuel temperature is difficult to estimate, use the intelligent tester and enter the following menus: Powertrain / Engine / Data List / Coolant Temp.

    10. Initialization is complete (Procedure "B").