VACUUM SWITCHING VALVE (for EVAP) INSTALLATION


  1. INSTALL VACUUM SWITCHING VALVE ASSEMBLY (for EVAP)

    A01DVAX

    1. Install the switching valve with the bolt.

      Torque:
      5.0 N*m  { 51 kgf*cm, 44 in.*lbf }
    2. Connect the 2 hoses.

    3. Connect the connector.

  2. INSTALL V-BANK COVER


    1. Install the cover with the 2 nuts.

      Torque:
      7.5 N*m  { 76.5 kgf*cm, 66 in.*lbf }
  3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

  4. PERFORM INITIALIZATION


    1. Perform initialization Click here.

      Note

      Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.