FRONT CONSOLE BOX(w/ Refrigerated Cool Box) INSTALLATION

PROCEDURE

  1. INSTALL CONSOLE BOX RETAINER

    1. Install the console box retainer with 4 screws.

  2. INSTALL COOLING BOX ASSEMBLY

    1. Connect the connector and install the console box assembly.

    2. Sufficiently apply compressor oil to 2 new O-rings.

      Compressor oil

      ND-OIL 8 or equivalent

    3. Install the 2 O-rings to the 2 cooler pipes.

    4. Connect the 2 cooler pipes with the 2 bolts.

      5.4 N*m

      55 kgf*cm

      48 in.*lbf

    5. Connect the drain hose.

    6. Install the 8 bolts.

      B360307C01

      *A

      for Slide Console Type

      *B

      except Slide Console Type

  3. INSTALL CENTER FLOOR CARPET COVER RH

    1. Attach the 3 claws to install the center floor carpet cover RH.

  4. INSTALL REAR CONSOLE END PANEL SUB-ASSEMBLY

  5. INSTALL COOLING BOX TRAY

    1. Install the cooling box tray.

  6. INSTALL REAR UPPER CONSOLE PANEL SUB-ASSEMBLY

  7. INSTALL UPPER CONSOLE PANEL SUB-ASSEMBLY

  8. INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY

  9. INSTALL INSTRUMENT PANEL FINISH PANEL END LH

  10. INSTALL INSTRUMENT PANEL FINISH PANEL END RH

  11. INSTALL FRONT NO. 1 CONSOLE BOX INSERT

  12. INSTALL FRONT NO. 2 CONSOLE BOX INSERT

  13. INSTALL NO. 1 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY

  14. INSTALL NO. 2 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY

  15. INSTALL FRONT SEAT ASSEMBLY RH

    1. Install the front seat assembly RH (Click here).

  16. CHARGE REFRIGERANT

  17. WARM UP ENGINE

  18. CHECK FOR REFRIGERANT GAS LEAK