LANE DEPARTURE ALERT SWITCH INSTALLATION

PROCEDURE


  1. INSTALL INTEGRATION CONTROL AND PANEL ASSEMBLY


    1. Engage the 2 claws to install the integration control and panel assembly.

  2. INSTALL LOWER INSTRUMENT PANEL FINISH PANEL ASSEMBLY

    Click here