CLUTCH RELEASE CYLINDER(for 2WW) INSTALLATION

PROCEDURE

  1. INSTALL CLUTCH RELEASE CYLINDER ASSEMBLY

    1. C299391

      Install the clutch release cylinder assembly with the 2 bolts.

      12 N*m

      122 kgf*cm

      9 ft.*lbf

  2. CONNECT CLUTCH RELEASE CYLINDER TO FLEXIBLE HOSE TUBE

    1. C344280C01

      *a

      Torque Wrench Fulcrum Length

      Using a 10 mm union nut wrench, connect the clutch release cylinder to flexible hose tube.

      Specified tightening torque

      15 N*m

      153 kgf*cm

      11 ft.*lbf

      Tip:
      • Calculate the torque wrench reading when changing the fulcrum length of the torque wrench.

        Click hereClick here

      • When using a union nut wrench (fulcrum length of 22 mm (0.8661 in.)) + torque wrench (fulcrum length of 162 mm (6.3779 in.)): 13.2 N*m (135 kgf*cm, 10 ft.*lbf)

  3. BLEED CLUTCH LINE

  4. CHECK FOR BRAKE FLUID LEAKAGE

  5. INSTALL NO. 1 AIR TUBE ASSEMBLY

  6. CONNECT NO. 2 AIR HOSE

  7. INSTALL NO. 4 WATER BY-PASS HOSE

  8. CONNECT ENGINE WIRE

  9. CONNECT COMPRESSOR OUTLET ELBOW

  10. INSTALL AIR CLEANER CASE SUB-ASSEMBLY

  11. INSTALL AIR CLEANER CAP SUB-ASSEMBLY WITH AIR CLEANER HOSE ASSEMBLY

  12. INSTALL BATTERY BRACKET REINFORCEMENT

  13. INSTALL BATTERY CARRIER ASSEMBLY

  14. INSTALL BATTERY TRAY

  15. INSTALL BATTERY

  16. INSTALL BATTERY INSULATOR

  17. INSTALL BATTERY CLAMP SUB-ASSEMBLY

  18. CONNECT CABLE TO POSITIVE BATTERY TERMINAL

  19. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note:

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected.

    Click hereClick here

  20. ADD ENGINE COOLANT

  21. INSPECT FOR COOLANT LEAK

  22. INSTALL NO. 1 ENGINE UNDER COVER